Date:23/6/2020
Title: Final week Fyp1
This is the final week for the semester and FYP 1. After submitting the FYP 1 report and progress report, all FYP 1 students need to do a presentation explaining their FYP to the accessors for project approval. Because of the special circumstance for this semester, face to face presentations cannot be held and the FYP committee asked all FYP students to make a video on their presentation. The video must briefly present the slide on the student's project. The video criteria are the presentation must not longer than 10 minutes because the time provided per student is only 15 minutes including the Q&A session. So here are my video presentation that i have prepare for the presentation FYP1.
Title: Conclusion
Conclusion
As the conclusion, the project demonstrates the design of the flood monitoring and
early warning system with the implementation of the Internet of Things (IoT)
which will support the project for the active flood occurrence of the selected
region. In addition, this project will also set up a network to provide the
relevant authorities and experts with information on the existing water level in
order to improve their responsibilities. Accurate prediction of flood is
critical as the early warning system to the public to alert them about
potential incoming flood disaster. As years roll on, this flood monitoring
system will make a lot of improvements to the newer technology. The group will
then interpret the warning message more quickly and more accurately